This carbon capture storage (CCS) repeat seismic survey’s objective is to regularly monitor the distribution of Carbon Dioxide (CO2), which had been injected into the 800–1100 m deep Utsira Formation sandstone since 1996.

At the time of writing, about 18 million tons of CO2 has been injected into the formation, and through time-lapse seismic studies the migration of the CO2 is being studied.

Why monitor Carbon Dioxide levels?

Previous repeat surveys (in total 9 monitor surveys since 1999) showed a large response from the injected CO2. Therefore, it has been possible to map the distribution of undissolved CO2 in detail.

The purpose of the current survey is to monitor the expansion of the plume, and to confirm that the CO2 has stayed within the formation and not penetrated the overburden.

Reliable seismic data acquisition

The Tetra Tech solution involves making optimal line planning decisions to ensure that the survey data is acquired efficiently, minimising the number of lines required for completion.

Achieving the 4D repeatability specifications ensures that the data acquired is of sufficient quality to meet the geophysical objectives to image the CO2 plume.

The acquisition of the 2020 Sleipner CO2 4D survey yielded good coverage and repeatability results, ensuring the survey met its geophysical objectives. SIMOPS played a part during the survey, which was coordinated and managed by Tetra Tech with no lost time or rejected data.

The survey only required 6 of the possible 10 E/W lines and was completed in 5 days, ahead of schedule and under budget.

At a glance

Client

Equinor

Completion date

2020

Location

Norwegian North Sea, Block 15/9, 160 miles west of Stavanger

Services

Offshore in-field feather predictions, optimise line selection, SIMOPS, and perform repeatability analysis to determine the quality of the survey

Connect with us. Reach out to our offshore energy experts in the UK and Europe.

The project featured in this article was undertaken by RPS, A Tetra Tech Company and originally published on RPSgroup.com. In March 2026 RPS rebranded to Tetra Tech.

Related highlights

Advancing the UK’s Largest Carbon Capture and Utilisation Plant

Large metal pipeline running overground through a grassy rural area with trees either side

Taking a New Look at CO₂ Storage Project Misconceptions

Aerial view of large industrial storage tanks connected by metal gantries and pipework

Enabling Carbon Capture and Storage with Pre-FEED Analysis

Sunlight shining through the sea from under water making a pattern on the seabed

Examining The London Protocol, Cross-Border Shipping, and Storage of CO₂ for Carbon Capture and Storage

Image of a saline reservoir under a blue sky with the sun directly above

Comparing Storage in Depleted and Deep Saline Reservoirs for Carbon Capture and Storage

A view of the edge of an ice sheet in an arctic landscape with the sea in the foreground

Exploring Common Myths About Carbon Capture and Storage

Scroll to Top